The new studios are now located in two porta-cabins (VERY generously donated!!!)
in the car park of the Royal Victoria Hospital.
To get the porta-cabins in place required a VERY big green crane (it had to
be green for safety reasons).
(Click a picture to see a bigger version. Select 'Back' after viewing the picture.)
 |
The crane was too big for the slope so the cabins had
to be loaded from the car-park. |
The first cabin is about to be unloaded. |
 |
 |
The cabins had to be delivered on big lorries. Here is
one coming the wrong way around the road system. |
The crane gets into position using all it's steering
wheels. |
 |
 |
The crane driver shows the forman how the crane works. |
The crane driver prepares the crane stabilizers for the
lift. |
 |
 |
Because of the slope of the car-park, the crane had to
use it's maximum extension for the stablizers. The crane driver provides
a good scale of reference. |
Everything is in place here and a fitter checks that
the door works. |
 |
 |
The first cabin gets lifted off the lorry. |
The connecting corridor is lifted off another lorry. |
 |
 |
The lorry pulls away and two men stand under the cabin.
They are not there to catch it! |
A 'camp' forman gives directions as the second cabin
is lowered into position. |
 |
 |
Two men pull the cabin into place. We are not sure why
they are wearing safety hurnesses? |
Two fitters fit the middle connecting section. This is
a tricky task that can only be tackled by someone smoking a cigarette. |
 |
 |
The second cabin goes into place. This is tricky because
the crane driver can see a thing from his position. |
The second lorry moves into position, just missing the
person taking the pictures. |
 |
 |
Two men prepare the second cabin before it is lowered
into position. A very nice use of day-glow vests. |
Crane and cabins. |
 |
 |
The second cabin is lifted off the lorry. We do not know
where the third, smaller one went but we don't have it. |
The site before and studio was delivered. Note the safety
cones preventing any access to the area. |
 |
 |
Here you see the site before any cabins were positioned. |
The crane driver shows off by doing hand-brake turns
in the car-park. |
 |
 |
Because the lorries were so big they had to go the wrong
way around the access roads. The man looking in his car was in for a surprise. |
|
|